ActionedQ-1182***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Le SommetLe Sommet—2 Sept 20262 Oct 20261 Nov 2026
SubmittedQ-1180***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St GympieMDT Property and Energy—1 Sept 20261 Oct 202631 Oct 2026
SubmittedQ-1177***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St GympieMDT Property and Energy—1 Sept 20261 Oct 202631 Oct 2026
DraftQ-1181***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St GympieMDT Property and Energy—1 Sept 20261 Oct 202631 Oct 2026
SubmittedQ-1176***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St GympieMDT Property and Energy—1 Sept 20261 Oct 202631 Oct 2026
SubmittedQ-1178***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St GympieMDT Property and Energy—1 Sept 20261 Oct 202631 Oct 2026
SubmittedQ-1179***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.GYMPIE SOUTHSIDE TOWN CENTRE - 1 Woolgar St GympieMDT Property and Energy—1 Sept 20261 Oct 202631 Oct 2026
SubmittedQ-1175***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Le SommetLe Sommet—31 Aug 202630 Sept 202630 Oct 2026
SubmittedQ-1172***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Comfort Hotel ClevelandComfort Hotel Cleveland—31 Aug 202630 Sept 202630 Oct 2026
ActionedQ-1173***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Sullivan Nicolaides Pathology Banora PointSullivan Nicolaides Pathology—31 Aug 202630 Sept 202630 Oct 2026
ActionedQ-1174***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Sullivan Nicolaides Pathology PottsvilleSullivan Nicolaides Pathology—31 Aug 202630 Sept 202630 Oct 2026
SubmittedQ-1171***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Complete Projects - 4B/100 Pearson Rd, YatalaComplete Project Consulting Trust T/A Complete Project Services—31 Aug 202630 Sept 202630 Oct 2026
SubmittedQ-1170The site fire detection and alarm system operates on a Pertronic F220 addressable fire indicator panel. A partial upgrade to addressable detection was completed approximately two years ago; the balance of the building remains protected by conventional detection devices. This scope covers the replacement of all remaining conventional detection with Pertronic addressable devices to complete the site-wide upgrade, providing individual device identification at the FIP, improved fault diagnostics, and a single consistent device platform for ongoing maintenance. Scope of Works Leading Fire Services will: - Notify the building occupier and the monitoring provider, and isolate the affected zones/monitoring prior to commencement each day, with reinstatement at completion of each shift. - Decommission and remove the existing conventional smoke detectors, thermal detectors and manual call point covered by this scope, and dispose of removed devices (photoelectric detectors disposed of in accordance with radioactive-source requirements where ionisation types are encountered). - Supply and install 28 × Pertronic addressable photoelectric smoke detectors with addressable bases. - Supply and install 9 × Pertronic addressable thermal detectors with addressable bases. - Supply and install 1 × Pertronic addressable manual call point. - Utilise existing field cabling where testing confirms it is suitable for addressable loop duty; extend/modify loop wiring at device locations as required to suit the new bases. - Address, program and label all new devices at the F220 FIP, including device descriptors, zone mapping, and alarm/ancillary functions consistent with the existing addressable installation. - Update the FIP configuration to remove redundant conventional zone circuits once cutover is complete. - Provide a single-man lift (EWP) including hire, for access to high-level detectors in the entry foyer; operators hold current EWP/working-at-heights qualifications. - Commission and test the completed installation in accordance with AS 1670.1, including 100% functional testing of all new devices, verification of alarm transmission to the monitoring service, and confirmation of occupant warning operation. Clearances & Exclusions - Re-cabling beyond reuse/minor modification of existing field wiring (if existing cabling proves unsuitable, re-cabling will be quoted as a variation). - Painting, patching or making good of ceiling/wall surfaces beyond installation-standard finish. - Devices or areas beyond the quantities listed above, including any areas that cannot be accessed at the time of works. - Rectification items covered under defect quote Q-1169 except where expressly superseded by this scope. - Works are quoted for normal business hours; after-hours cutover available on request.Comfort Hotel ClevelandComfort Hotel Cleveland—27 Aug 202627 Sept 202626 Oct 2026
SubmittedQ-1169Rectification of defects identified during the annual AS 1851-2012 inspection of the fire detection and alarm system on 26 August 2026 (task T-19300), including replacement of failed detectors and batteries, refixing of dislodged detectors and manual call points, occupant warning system speaker repairs, and detection coverage items identified in the protected areas survey against AS 1670.1-1995. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Comfort Hotel ClevelandComfort Hotel Cleveland—26 Aug 202626 Sept 202625 Oct 2026
SubmittedQ-1163***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Ginger Ninja Café & BarGinger Ninja Café & Bar—25 Aug 202625 Sept 202624 Oct 2026
ActionedQ-1167***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Yarrabilba Veterinary Hospital, 55-61 Adler Cct, YarrabilbaYarrabilba Veterinary Hospital—25 Aug 202625 Sept 202624 Oct 2026
SubmittedQ-1162***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Ray White TMG - OxenfordRay White TMG—25 Aug 202625 Sept 202624 Oct 2026
SubmittedQ-1165***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Yarrabilba Veterinary Hospital, 55-61 Adler Cct, YarrabilbaYarrabilba Veterinary Hospital—25 Aug 202625 Sept 202624 Oct 2026
SubmittedQ-1164***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Brigidine CollegeBrigidine College—25 Aug 202625 Sept 202624 Oct 2026
SubmittedQ-1168***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Best Doors Coolum BeachBest Doors Coolum Beach—25 Aug 202625 Sept 202624 Oct 2026
ActionedQ-1166***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Yarrabilba Veterinary Hospital, 55-61 Adler Cct, YarrabilbaYarrabilba Veterinary Hospital—25 Aug 202625 Sept 202624 Oct 2026
SubmittedQ-1161***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Ray White TMG - OxenfordRay White TMG—25 Aug 202625 Sept 202624 Oct 2026
ActionedQ-1159***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Le SommetLe Sommet—17 Aug 202617 Sept 202616 Oct 2026
ActionedQ-1160***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Christine Court - Assisted LivingAssisted Living Australia—17 Aug 202617 Sept 202616 Oct 2026
SubmittedQ-1158***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.SERENDIPITY CTS 8102 - 48 O'connor St, TugunAble Fire—12 Aug 202612 Sept 202611 Oct 2026
SubmittedQ-1157***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.SERENDIPITY CTS 8102 - 48 O'connor St, TugunAble Fire—12 Aug 202612 Sept 202611 Oct 2026
ActionedQ-1156***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.51-73 The Lanes BoulevardBao Li Investments Pty Ltd ATF—6 Aug 20266 Sept 20265 Oct 2026
SubmittedQ-1155***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Stage ProjectsBOP 2 YPTT Pty Ltd—3 Aug 20263 Sept 20262 Oct 2026
ActionedQ-1153***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Airefrig Australia - 29-35 Huntington Pl, BanyoAirefrig Australia Pty Ltd—2 Aug 20262 Sept 20261 Oct 2026
ActionedQ-1154***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Airefrig Australia - 29-35 Huntington Pl, BanyoAirefrig Australia Pty Ltd—2 Aug 20262 Sept 20261 Oct 2026
ActionedQ-1152***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Sullivan Nicolaides Pathology 4 Page Ct, Highland ParkSullivan Nicolaides Pathology—31 July 202631 Aug 202629 Sept 2026
SubmittedQ-1147***Following a routine inspection, a number of critical defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.KilargoKilargo—30 July 202630 Aug 202628 Sept 2026
ActionedQ-1149***Following a routine inspection, it was identified that the existing fire extinguishers were well beyond their lifecycle and not in an operational condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.4/9 Pendrey CtRay White AKG—30 July 202630 Aug 202628 Sept 2026
ActionedQ-1148***Following a routine inspection, it was identified that the existing 9.0kg ABE fire extinguisher had lost all pressure and was well past its lifecycle. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.1/9 Pendrey CtRay White AKG—30 July 202630 Aug 202628 Sept 2026
SubmittedQ-1151***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Night & Day Auto CareRay White AKG—30 July 202630 Aug 202628 Sept 2026
SubmittedQ-1150***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Night & Day Auto CareRay White AKG—30 July 202630 Aug 202628 Sept 2026
SubmittedQ-1145***This quotation is for information purposes only. Leading Fire Services are of the understanding that the works will be completed by another contractor and as such, a zero-dollar value has been applied to this quotation.*** ***The exit lights identified below require relocating to order to be visible on approach. They are currently obstructed by pallet racking. Parts of the racking will be required to be removed in order to access the existing wiring connections and support structure for the exit lights.***Donaldson EnterprisesDonaldson Nominees—21 July 202621 Aug 202619 Sept 2026
DeletedQ-1142PhibionPhibion—21 July 202621 Aug 202619 Sept 2026
SubmittedQ-1143***Brisbane Logistics - Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Donaldson EnterprisesDonaldson Nominees—21 July 202621 Aug 202619 Sept 2026
SubmittedQ-1144***Donaldson Enterprises - Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Donaldson EnterprisesDonaldson Nominees—21 July 202621 Aug 202619 Sept 2026
VoidedQ-1146***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Marlborough CTS 12012Marlborough CTS 12012—21 July 202621 Aug 202619 Sept 2026
ActionedQ-1141***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.144 Brisbane Street144 Brisbane Street—15 July 202615 Aug 202613 Sept 2026
ExpiredQ-1138*** This quotation is for information purposes only. Leading Fire Services are of the understanding that the works will be completed by another contractor and as such, a zero-dollar value has been applied to this quotation. ***Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ExpiredQ-1139*** This quotation is for information purposes only. Leading Fire Services are of the understanding that the works will be completed by another contractor and as such, a zero-dollar value has been applied to this quotation. ***Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ExpiredQ-1140*** This quotation is for information purposes only. Leading Fire Services are of the understanding that the works will be completed by another contractor and as such, a zero-dollar value has been applied to this quotation. ***Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ExpiredQ-1137*** This quotation is for information purposes only. Leading Fire Services are of the understanding that the works will be completed by another contractor and as such, a zero-dollar value has been applied to this quotation. ***Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ExpiredQ-1136***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ActionedQ-1135***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ExpiredQ-1134***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026
ExpiredQ-1133***Following a routine inspection, a number of defects were identified that require attention to maintain safety, performance, and overall condition. The below quotation outlines the recommended works to address these items and prevent further deterioration.*** The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that: (4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse. Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Brigidine CollegeBrigidine College—2 July 20262 Aug 202631 Aug 2026