Defect Quotes

1,192 quotes

StatusRefPropertyClientSeverityRaisedDueExpires
ActionedQ-0144Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Public Services ClubDestination Brisbane Consortium—13 Nov 202313 Dec 202313 Dec 2023
ActionedQ-0143Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Public Services ClubNational Archives Australia—13 Nov 202313 Dec 202313 Dec 2023
VoidedQ-0142Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.National Archives AustraliaNational Archives Australia—13 Nov 202313 Dec 202313 Dec 2023
ActionedQ-0141Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. We have identified that when the new Fire Detection System was upgraded, the Sprinkler system has been grouped into Zone 2 which is one portion of the Ground Floor. This Sprinkler System covers the entire building and must be grouped on it's own zone. In our quotation, we have allowed for the following works; * Re-programing of the existing Fire Indicator Panel to create a new Zone Group and to reprogram all associated monitoring of the Sprinkler System into the new zone. * Upgrading of the existing Fire Indicator Panel to reflect the required changes. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.National Archives AustraliaNational Archives Australia—13 Nov 202331 Jan 202431 Jan 2024
ActionedQ-0140Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.National Archives AustraliaDestination Brisbane Consortium—13 Nov 202313 Dec 202313 Dec 2023
ActionedQ-0137Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PURE EnvironmentalPure Environmental Qld Metro Pty Ltd—8 Nov 20238 Dec 20238 Dec 2023
ActionedQ-0136Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Marlborough CTS 12012Marlborough CTS 12012—8 Nov 20238 Dec 20238 Dec 2023
VoidedQ-0135** MAIN FIP GATEHOUSE LOCATION DIAGRAM DECEMBER 2023 ** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 20231 Jan 20241 Jan 2024
DeletedQ-0126PROGRESS RAIL FIRE HYDRANTS Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • No allowance has been made in thsi quotation for 3rd Party SIte Inductions into the Construction Area for these works. • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 20237 Dec 20237 Dec 2023
ActionedQ-0134** ENGINE REBUILD - ADMIN FIRE PANEL DEFECTS MAY 2024 ** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 202330 June 202430 June 2024
VoidedQ-0133Leading Fire Services are pleased to submit for your consideration our proposal for the repair works to the Loco Assembly Fire Indicator Panel which is currently failing and requires urgent replacement. In our quotation, we are proposing the following works; ** Stage 1 - Pattern Shop F.I.P. ** * We have allowed for the disconnection of all associated cabling within the Pattern Shop Fire Indicator Panel and removal from its current location * Installation of 1 x new replacement Fire Indicator Panel - to be installed in place of the existing Pattern Shop Fire Indicator Panel * Internal termination of all associated cabling within the new Pattern Shop Fire Indicator Panel. * The location and replacement of all existing "end of line" resistor devices on each monitored circuit. All of these will be at height. * Full Test and Commission on completion to confirm correct operation of this new Pattern Shop Fire Indicator Panel. ** STAGE 2 - LOCO ASSEMBLY FIRE PANEL REPAIR ** * Utilising the old Pattern Shop Fire Indicator Panel as spare parts, replace existing failing components within the Loco Assembly Fire Indicator Panel in an attempt to rectify the Critical Defect currently active on this system. * Full Test and Commission on completion to confirm that the Loco Assembly Fire Indicator Panel is bac n line and Operational. ** Please Note that these works are in an attempt to minimise the costs associated with replacing the failing Loco Assembly Fire Indicator Panel. We cannot guarantee that the old redundant parts within the old Pattern Shop Fire Indicator Panel will remain online and operational for the foreseeable future. We would recommend that even if these rectification works are successful, the Progress Rail submits a Capital expenditure (CAPEX) request to allow for this Fire Panel to be replaced in the near future. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 202329 Feb 202429 Feb 2024
DeletedQ-0132** PROGRESS RAIL - LOCO ASSEMBLY FIRE PANEL DEFECTS DECEMBER 2023 ** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 20231 Jan 20241 Jan 2024
DeletedQ-0131** PROGRESS RAIL- SITE SERVICES FIRE DETECTION SYSTEM DEFECTS ** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 20231 Jan 20241 Jan 2024
DeletedQ-0130PROGRESS RAIL - FOUNDRY BUILDING FIRE EXTINGUISHERS Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.Progress Rail RedbankProgress Rail—7 Nov 20237 Dec 20237 Dec 2023
VoidedQ-0129PROGRESS RAIL FIRE BLANKETS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 202331 July 202431 July 2024
VoidedQ-0128Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 20237 Dec 20237 Dec 2023
VoidedQ-0127Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Due to the nature of the site, we have allowed for a safety spotter for all light replacements. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Purchase or Hire of any safety or bollarding equipment for Safety barricading. Safety barricading to be supplied by the client. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 20237 Dec 202331 Jan 2024
VoidedQ-0125ENGINE REBUILD AND STORES FIRE EXTINGUISHERS Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—7 Nov 202331 Dec 202331 Dec 2023
ActionedQ-0124Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.113 Brisbane StreetAustral Meikang International Pty Ltd—7 Nov 20237 Dec 20237 Dec 2023
DeletedQ-0123Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.National Archives AustraliaNational Archives Australia—6 Nov 20236 Dec 20236 Dec 2023
ActionedQ-0122Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Donaldson EnterprisesDonaldson Nominees—6 Nov 20236 Dec 20236 Dec 2023
ActionedQ-0121** FIRE EXTINGUISHER DEFECT REPAIRS QUOTATION - DECEMBER 2023 ** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. *We have allowed for this repair to be done as part of our monthly service run. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.My Health CityThe Hope Island Investment Trust c/- Savills (Qld) Pty Ltd—6 Nov 20231 Jan 202429 Feb 2024
ActionedQ-0120Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PCYC RockhamptonQLD Police Citizens Youth Welfare Association—6 Nov 20236 Dec 20236 Dec 2023
VoidedQ-0119Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—6 Nov 202331 Dec 202331 Dec 2023
ActionedQ-0118Building I (Amenities Building) Leading Fire Services are pleased to submit for your consideration, the variation which now includes the requested works for the additional demountable building. NOTE: In reference to the existing cabling, no allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Rockhampton RailProgress Rail—6 Nov 20236 Dec 20236 Dec 2023
ActionedQ-0109Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Pepe's Mexican Restaurant (Jindalee)Pepe's Mexican Restaurant (Jindalee)—3 Nov 20233 Dec 20233 Dec 2023
ActionedQ-0117ADMINISTRATION BUILDING FIRE EXTINGUISHERS Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202330 June 202430 June 2024
ActionedQ-0116CANTEEN, AMENITIES AND LUNCHROOM FIRE EXTINGUISHERS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
ActionedQ-0115PROGRESS RAIL - SECURITY GATEHOUSE & PUMP SHED FIRE EXTINGUISHERS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
ActionedQ-0114PROGRESS RAIL - MAIN STORE FIRE EXTINGUISHERS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
ActionedQ-0113PATTERN SHOP / SITE SERVICES FIRE EXTINGUISHERS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
ActionedQ-0112STEAM CLEANING SHED FIRE EXTINGUISHERS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
ActionedQ-0111TRAIN INSPECTIONS AND BOSH AREA FIRE EXTINGUISHERS - July 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
ActionedQ-0110PROGRESS RAIL - TRAINING CENTRE FIRE EXTINGUISHERS - JULY 2024 Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—3 Nov 202331 July 202431 July 2024
DeclinedQ-0108Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Pepe's Mexican Restaurant (Newmarket)Pepe's Mexican Restaurant (Newmarket)—3 Nov 202330 Dec 202330 Dec 2023
ActionedQ-0107Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Pepe's Mexican Restaurant (Newmarket)Pepe's Mexican Restaurant (Newmarket)—3 Nov 20233 Dec 202330 Dec 2023
DeclinedQ-0106Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Pepe's Mexican restaurant (Bayside)Pepe's Mexican Restaurant (Bayside)—3 Nov 20233 Dec 20233 Dec 2023
ActionedQ-0105Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Pepe's Mexican restaurant (Bayside)Pepe's Mexican Restaurant (Bayside)—3 Nov 20233 Dec 20233 Dec 2023
VoidedQ-0104Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—3 Nov 20233 Dec 20233 Dec 2023
ActionedQ-0103Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.147 George StreetBeenleigh Investment Trust—3 Nov 20233 Dec 202329 Feb 2024
VoidedQ-0101Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—2 Nov 20232 Dec 20232 Dec 2023
VoidedQ-0102It was identified whilst conducting the routine Monthly Servicing of the combined Fire Hydrant / Sprinkler Pump system on 26/10/2023 that the Pressure relief Valve on the discharge line is passing and not locking down at 1100 Kpa as required per design parameters. This valve has failed and requires replacement. Also, due to the original design and installation, there is also no isolation valve in place to isolate this section of the pipework to further investigate and rectify without isolating the non-potable supply to the Prison Water supply system. Also identified that the valve in question is designed for agricultural purposes and not used for Fire System purposes. In order to rectify the above identified issues, we are required to conduct the following works; * Isolate the non-potable supply to the Prison after normal hours to minimise the impact of no supply water for the Prison and drain down system. * Un-bolt and remove the existing failed Pressure Relief Valve. * Unbolt and remove the existing 6-inch pipe section with sight glass. * Installation of a new 6-inch Fire designated Pressure Relief Valve (red). * Installation of a new 6 inch monitored wafer valve. * Installation of a new temporary 6-inch pipe section - Fabrication to be done by others whilst works are being conducted. New permanent pipe section will be separately fabricated with new site glass and drain installed. to be fitted at a later date once fabrication is completed. * Modifications to the existing monitor interface to the Fire Indicator Panel located in X3 to incorporate the new monitored valve to be installed (Wired in Normally closed position when valve open, open state when valve closed to indicate fault status on X3 Fire Indicator Panel). * Re-instatement of the non-potable water for the Prison on completion. * Calibration and adjustment of the new Pressure Relief Valve on completion to recalibrate to 1100 kPa as per design parameters. INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). • Work outside of Leading Fire Services normal working hours (as nominated above). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—2 Nov 20232 Dec 20232 Dec 2023
ActionedQ-0100Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—2 Nov 20232 Dec 20232 Dec 2023
DeletedQ-0097144 Brisbane Street144 Brisbane Street—1 Nov 20231 Dec 20231 Dec 2023
ActionedQ-0099Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—1 Nov 20231 Dec 20231 Dec 2023
VoidedQ-0098Ellenborough HouseEllenborough House—1 Nov 20231 Dec 20231 Dec 2023
ActionedQ-0094** PROGRESS RAIL - HITACHI DEMOUNTABLES FIRE EXTINGUISHER DEFECTS QUOTATION - JUNE 2024 ** Leading Fire Services are pleased to submit for your consideration our proposal for the installation of new Fire Extinguishers located in the Hitachi Demountables at Progress Rail. This was identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Progress Rail RedbankProgress Rail—30 Oct 202331 July 202431 July 2024
ActionedQ-0096Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—30 Oct 202329 Nov 202329 Nov 2023
VoidedQ-0095Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Southern Queensland Correctional CentreSouthern Queensland Correctional Centre—30 Oct 202329 Nov 202329 Nov 2023
ActionedQ-0093Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Mayfair ResidencesMayfair Residences CTS 31233—27 Oct 202326 Nov 202326 Nov 2023

1,051–1,100 of 1,192