Q-0030
Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
PCYC Fortitude Valley
QLD Police Citizens Youth Welfare Association
—
28 Aug 2023
30 June 2024
30 June 2024
Voided
Q-0029
Supply and install a new Crossley display card
A Wood Shed
Ford Mountain P/L as Trustees to the Richard Ford Family Trust
—
18 Aug 2023
17 Sept 2023
17 Sept 2023
Voided
Q-0028
Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.
A Wood Shed
Ford Mountain P/L as Trustees to the Richard Ford Family Trust
—
16 Aug 2023
15 Sept 2023
15 Sept 2023
Voided
Q-0025
Leading Fire Services are pleased to submit for your consideration our proposal for the upgrade of the non-compliant fire tanks identified during the recent inspection of the fire protection equipment. 1. Supply & Installation of if Galvanised Panel Tank with up to 25 Year Warranty 2. Design based on AWWA D103-1997, Engineering, Supply, Install & Testing of Galvanised Bolted Panel Tanks with 30 Years Design Life & 25 Year Warranty. 3. Non-trafficable colorbond roof with Manhole & Filler Box 4. Reinforced PVC Internal Liner with 15 Year Warranty - Waterproofed to all penetrations 5. Design and Engineering 6. Galvanised Wind Girders 7. Straight up internal ladder engineered to AS4020 8. External ladder & lockable cage engineered to AS4020 9. Galvanised Rooftop Landing Platform with Handrails 10. All Internal & External Fittings - Suction with Anti-Vortex, Overflow, Inlet and Drain 11. HDG Side Access Manway 750mm Diameter 12. Water Level Indicator 13. Delivery to site 14. Insurances, SWMS, ITP’s, Warranties, O&M Manual, Permits and Programs 15. 3 x Confined Space and Working at Heights Trained Technicians 16. Hire of Gas Detector and Emergency Extraction System 17. Form 15 & 16 - Engineering
Cabanda Care
Cabanda Care
—
4 Aug 2023
3 Sept 2023
3 Sept 2023
Voided
Q-0021
Attend site and diagnose / test the diesel engine and provide a report
119 Macquarie Street
119 Macquarie Street
—
31 July 2023
30 Aug 2023
30 Aug 2023
Voided
Q-0020
Scope of Works. - Design of site wide hydrant system. - Design Drawings. - Form 15.
Rockhampton Rail
Rockhampton Rail
—
31 July 2023
30 Aug 2023
30 Aug 2023
Voided
Q-0019(v2)
Building G and Amenities No allowance has been made for the installation of new wiring should the existing be found to be faulty. We have not allowed for a high risk spotter for working at heights.
Rockhampton Rail
Rockhampton Rail
—
31 July 2023
24 Jan 2024
24 Feb 2024
Voided
Q-0018
During the recent investigation and repair of the damaged fire detection wiring, the following issues were identified for rectification. Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
PCYC Capricorn Coast
QLD Police Citizens Youth Welfare Association
—
31 July 2023
31 Jan 2024
31 Jan 2024
Voided
Q-0015
During the recent fire door inspection, the following defects were identified for rectification.
National Archives Australia
National Archives Australia
—
31 July 2023
6 Dec 2023
6 Dec 2023
Voided
Q-0013
During the recent 6 monthly inspection, the following items were identified for rectification.
The Mansions
Destination Brisbane Consortium
—
28 July 2023
27 Aug 2023
27 Aug 2023
Voided
Q-0010
1. Supply & Install of 2 x Tank Capacity, 2 x Tank Purpose, 2 x Confined Space, 1 x Level Indicator Signage 2. Supply & Install of 2 x New Level Indicators to suit Tanks 3. Reinstate Site 4. Confined Space and Working at Heights Trained Technicians & Equipment 5. Rental of EWP & Scissor Lift 6. Insurances, SWMS, Program and Permits
Southern Queensland Correctional Centre
Southern Queensland Correctional Centre
—
24 July 2023
23 Aug 2023
23 Aug 2023
Voided
Q-0009
Mark up and supply a new AS1670.1 compliant A3 block plan for the fire indicator panel.
idec Solutions Pty Ltd
idec Solutions Pty Ltd
—
12 July 2023
11 Aug 2023
11 Aug 2023
Voided
Q-0006
Scope of Works: Disconnect and reconnect detectors and speakers as indicated on drawings for the Admin Building at Progress Rail. Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • No allowance has been made for the supply and install of replacement speakers or detectors should the existing be unable to be reused. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful, costs will apply for pipe freeze. NOTES & CONDITIONS: • The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
Progress Rail Redbank
Formula Interiors Pty Ltd
—
18 June 2023
31 Jan 2024
31 Jan 2024