| Actioned | Q-0527** Leading Fire Services are pleased to submit for your consideration our proposal for the 5 yearly fire hydrant system overhaul and inspection. **
**Scope of Works**
**1. Overhaul 26 x hydrant valves and booster inlets.**
**2. Conduct a hydrostatic pressure test.**
**3. Conduct a booster flow test.**
**4. Provide a Form 72.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Donaldson Enterprises | Donaldson Nominees | — | 15 Nov 2024 | 15 Dec 2024 | 14 Jan 2025 |
| Actioned | Q-0526** Leading Fire Services are pleased to submit for your consideration our proposal for the 5 yearly sprinkler system inspection and overhaul. **
**Scope of Works**
**1. Carry out a 5 yearly service of the 2 x sprinkler alarm valves.**
**2. Supply and install a new twin booster inlet to replace the leaking booster.**
**3. Carry out a 5 yearly service of the remaining 6 x booster inlets.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Donaldson Enterprises | Donaldson Nominees | — | 15 Nov 2024 | 15 Dec 2024 | 14 Jan 2025 |
| Actioned | Q-0529***DONALDSON ENTERPRISES - OBSOLETE FIRE PANEL REPLACEMENT - NOVEMBER 2024***
** Leading Fire Services are pleased to submit for your consideration our proposal to upgrade the existing obsolete fire panel and associated field equipment. **
**Scope of Works**
**1. Supply and install a new Pertronic F220 addressable fire indicator panel including weather-proof enclosure.**
**2. Supply and install new addressable monitored inputs in the fire pump shed.**
**3. Supply and install a new addressable manual call point to replace the manual call point in the ground floor entry foyer.**
**4. Reproduction of the existing Fire Alarm Panel Block Plan.**
**5. Programming and commissioning.**
**6. 12 months warranty on equipment.**
**Please note that we have allowed to reuse the existing wiring. No new wiring has been allowed for in this proposal.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Donaldson Enterprises | Donaldson Nominees | — | 15 Nov 2024 | 15 Dec 2024 | 14 Jan 2025 |
| Actioned | Q-0528** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Donaldson Enterprises | Donaldson Nominees | — | 15 Nov 2024 | 15 Dec 2024 | 14 Jan 2025 |
| Actioned | Q-0524** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**As discussed with Julie-Anne on site, the high-pressure level pipe on the Fire Jacking Pump is leaking and requires replacement. In our quotation, we have allowed to replace the existing non-compliant Fire Sprinkler flexible pipe with pre-engineered high pressure line.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Cabanda Care | Cabanda Care | — | 13 Nov 2024 | 13 Dec 2024 | 12 Jan 2025 |
| Actioned | Q-0520** Leading Fire Services are pleased to submit for your consideration our proposal for the alteration to the existing Residential Fire Sprinkler System in the Link Corridor Between the Main Building and the Dementia Unit.
**In our quotation, we have allowed for the following;**
**Draining down of the existing Fire Sprinkler System**
**The Installation of an additional 8 x new Fire Sprinkler heads to protect the concealed Space throughout the Link Corridor.**
**Re-pressurisation of the existing system and confirmation of system stability**
**Form 12 to be provided on completion of the above works.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
**INCLUSIONS:**
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
**EXCLUSIONS:**
• Form 15 design. Our quotation is based of supplied drawings (Project Number: 2001 - Drawing Number SK01 Revision P01), site inspection by our Sprinkler fitter and requirement from AS-2118.4 - 2012. If a Form 15 design is required, a variation will be sought for the supply of this Form 15 design.
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Northbuild Constructions - Cabanda Care Inc | Northbuild Construction QLD PTY LTD | — | 8 Nov 2024 | 8 Dec 2024 | 7 Jan 2025 |
| Actioned | Q-0519** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
** After the recent site inspection by Leading Fire and QFES representatives, it has been indentified that a potential cause of the unwanted Sprinkler activation has being caused by the old SPrinkler pressure switch. Our quotation is for the replacedmentg of this pressure switch.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Carrolls Springs | Carrolls Springs Pty Ltd | — | 7 Nov 2024 | 7 Dec 2024 | 6 Jan 2025 |
| Actioned | Q-0517** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
** The Wafer-check valves on the Fire Hydrant Electric and Diesel Pumps are overdue for replacement. Our quotation is for the replacement of these wafer check valves.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 25 Oct 2024 | 24 Nov 2024 | 24 Dec 2024 |
| Actioned | Q-0516***PROGRESS RAIL - FIRE HYDRANT SYSTEM 5-YEARLY VALVE OVERHAULS AND HYDROSTAIC TESTING - OCTOBER 2024***
** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
* The Fire Hydrant system at Progress Rail is now due for the 5-Yearly Valve Overhaul and Hydrostatic Testing. Our quotation is for the following;
* The Overhaul of all above ground Fire Hydrant Valves.
* Hydrostatic Testing of the Fire Hydrant System.
At the advise of our Fire Engineer, separate Flow Tests will be done for the following buildings;
* Engine Rebuild System Flow Test.
* Loco Shop system Flow Test.
* Foundry Building system Flow Test.
* Boosted System Pressure test.
Due to the recent works that have been conducted on the Fire Hydrant system at Progress Rail, we will be carrying out the Boosted pressure test in a staged format, firstly boosting the system surrounding the Pump Sets, and progressively introducing the additional sections one at a time to limit the potential of multiple failure points.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 25 Oct 2024 | 24 Nov 2024 | 24 Dec 2024 |
| Actioned | Q-0513** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**Whilst onsite conducting recent 5-Yearly Sprinkler Works, our Sprinkler Fitter has identified a section of existing pipework that is severely corroded and requires replacement. Our quotation is for the replacement of this corroded pipework.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | National Archives Australia | National Archives Australia | — | 23 Oct 2024 | 22 Nov 2024 | 22 Dec 2024 |
| Actioned | Q-0515** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment.**
**It was identified on our most recent test on the site's Fire Hose Reels that the following Fire Hose reels require repair.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Mayfair Residences | Mayfair Residences CTS 31233 | — | 23 Oct 2024 | 28 Feb 2025 | 28 Feb 2025 |
| Actioned | Q-0514** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**Whilst conducting the 5-Yearly Sprinkler System overhaul, our Sprinkler fitter has identified that the old alarm stop cock valves are seized and require replacement. in our quotation, we have allowed for the replacement of these with new ball-gate style valves in order to prevent the valves seizing in the future.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | National Archives Australia | National Archives Australia | — | 23 Oct 2024 | 22 Nov 2024 | 22 Dec 2024 |
| Actioned | Q-0512** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**As discussed with Shane Walsh, there are a number of existing smoke and thermal detectors in the Site Services / Patten Shop building that require replacement to return this system to a fully compliant state.**
**Our quotation is for the replacement of additional detectors in site services / pattern shop building, namely the Store area, toilet, and Office area. All other locations throughout this building have had the detection system replaced in the last 6 months.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 21 Oct 2024 | 20 Nov 2024 | 20 Dec 2024 |
| Actioned | Q-0508** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**As a result of the investigation works into the failing underground Fire Systems cabling for the Canteen Building and the pattern Shop Sub Fire Indicator Panel and subsequent meeting with I.T. Services and Site Services staff, Leading Fire was advised that Progress Rail wishes for Leading Fire to resolve this issue.
It was identified that the cabling from each Fire Panel to the respective I.D.F. is in good working order. The cable failure is coming from the phone cabling that is patched through from each I.D.F. underground back to the Gate House.
In order to rectify this, we will need to trace out spare telephone cabling from each IDF located in the Canteen and Pattern Shop I.D.F. boards, and patch through the IDF boards in the Main Store (x2) back to the Gatehouse.**
*** Please Note that whilst every care will be taken to mitigate any potential loss of Phone services on site, Leading Fire will not be held responsible if this does occur. This Telephone system forms part of Progress Rail's infrastructure and we were advised that this system is no longer in use.***
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 15 Oct 2024 | 14 Nov 2024 | 14 Dec 2024 |
| Actioned | Q-0506** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**PROGRESS RAIL - PATTEN SHOP QUOTE 2 - SUPPLY OF LABOUR AND SUNDRIES FOR FIRE PANEL AND DETECTOR REPLACEMENT - OCTOBER 2024**
**In this quotation, we have allowed for the required Technician Labour and sundry items for carrying out the Replacement of the Patten Shop Fire Panel as well as the Detector replacements on Zones 1, 2, and 7.**
***We have not allowed for any associated cost with the hire or supply of an E.W.P. for these works. We will utilise the Progress Rail E.W.P. on site for these works***
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 4 Oct 2024 | 3 Nov 2024 | 3 Dec 2024 |
| Actioned | Q-0505** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**As previously advised and due to recent unwanted Fire Alarm activation, we have allowed for the supply of the following items in our quotation;**
**Supply of 18 x Addressable Smoke Detector Heads and bases - Zone 2
Supply of 2 x Addressable Manual Call Points - Zone 1
Supply of 4 x addressable Weather resistant Heat detectors - Zone 7
Supply and Installation of New Fire Alarm Block Plan**
***NOTE: Please note that this quotation is for the supply of the required smoke, heat detectors and manual call points to resolve the issues previously raised on zones 1, 2, and 7. only. Labour for these works has been allowed for in Quotation 2.***
***We have not allowed for any associated cost with the hire or supply of an E.W.P. for these works. We will utilise the Progress Rail E.W.P. on site for these works***
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 4 Oct 2024 | 3 Nov 2024 | 3 Dec 2024 |
| Actioned | Q-0495** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Mayfair Residences | Mayfair Residences CTS 31233 | — | 30 Sept 2024 | 30 Oct 2024 | 29 Nov 2024 |
| Actioned | Q-0499** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
* In our quotation, we have allowed for the replacement of 2 x 12-volt 33 A/H batteries with new as the existing are over 2 years old. In order to assist with cost reduction, we have allowed for these batteries to be replaced on at the next routine Monthly Service if approved.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Mayfair Residences | Mayfair Residences CTS 31233 | — | 30 Sept 2024 | 30 Oct 2024 | 29 Nov 2024 |
| Actioned | Q-0498** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Pepe's Mexican Restaurant (Jindalee) | Pepe's Mexican Restaurant (Jindalee) | — | 30 Sept 2024 | 30 Oct 2024 | 29 Nov 2024 |
| Actioned | Q-0497** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Pepe's Mexican restaurant (Bayside) | Pepe's Mexican Restaurant (Bayside) | — | 30 Sept 2024 | 30 Oct 2024 | 29 Nov 2024 |
| Actioned | Q-0493** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Whilst conducting the recent Annual inspection on the sites Fire Extinguishers it was identified that a number are due for the 5-Yearly Pressure Test Swap out. Our quotation is for the replacement of these out-of-date units with new units.
Alos, we have also identified a number of Fire Extinguishers signs that are in a bad level of damage etc. We have made a sundry allowance in our quotation to re-fresh some of these whilst on site.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Brisbane Manor Hotel | Brisbane Manor Hotel | — | 27 Sept 2024 | 27 Oct 2024 | 26 Nov 2024 |
| Actioned | Q-0492** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** | The Tiger Group | Jaha Consulting Services Pty Ltd | — | 25 Sept 2024 | 25 Oct 2024 | 24 Nov 2024 |
| Actioned | Q-0490** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Our quotation is for the additional Fire Extinguisher repairs identified on the recent Fire Extinguisher inspection on 20th September 2024.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Brisbane Christian College | Brisbane Christian College Ltd | — | 23 Sept 2024 | 23 Oct 2024 | 22 Nov 2024 |
| Actioned | Q-0491** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**These listed items were additional lights identified on the recent Exit and Emergency Lighting test done on the 20th September 2024.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Brisbane Christian College | Brisbane Christian College Ltd | — | 23 Sept 2024 | 23 Oct 2024 | 22 Nov 2024 |
| Actioned | Q-0489** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Cabanda Care | Cabanda Care | — | 19 Sept 2024 | 19 Oct 2024 | 18 Nov 2024 |
| Actioned | Q-0480(v2)** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
***Due to the site and height requirements, we have allowed for 2 x technicians to be on site for the duration of these works.***
**NOTE: We have not allowed for the supply and hire of an elevated work platform for these works. This is to be supplied by Progress Rail.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Progress Rail Redbank | Progress Rail | — | 16 Sept 2024 | 16 Oct 2024 | 30 June 2025 |
| Actioned | Q-0485** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Due to the site and height requirements, we have allowed for 2 x technicians to be on site for the duration of these works.
NOTE: We have not allowed for the supply and hire of an elevated work platform for these works. This is to be supplied by Progress Rail.
***NOTE: Free and Clear access will need to be provided for these repair works***
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Progress Rail Redbank | Progress Rail | — | 16 Sept 2024 | 16 Oct 2024 | 15 Nov 2024 |
| Actioned | Q-0484** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**Due to the site and height requirements, we have allowed for 2 x technicians to be on site for the duration of these works.**
**NOTE: We have not allowed for the supply and hire of an elevated work platform for these works. This is to be supplied by Progress Rail.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Progress Rail Redbank | Progress Rail | — | 16 Sept 2024 | 16 Oct 2024 | 15 Nov 2024 |
| Actioned | Q-0483** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**Due to the site and height requirements, we have allowed for 2 x technicians to be on site for the duration of these works.**
**NOTE: We have not allowed for the supply and hire of an elevated work platform for these works. This is to be supplied by Progress Rail.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Progress Rail Redbank | Progress Rail | — | 16 Sept 2024 | 16 Oct 2024 | 15 Nov 2024 |
| Actioned | Q-0478** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
It has been identified that the 5-Yearly Testing and Inspection is due for the Fire Hydrant System at Redeemer Lutheran College. Our quotation is for the following works;
* Overhaul of all existing above ground Fire Hydrant Heads
* Hydrostatic Testing to confirm system will operate as required.
Form 72 will be supplied on completion of these works.
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.
As of 1 January 2024, Leading Fire is pleased to advise that we are now utilising the full client Portal features of our Maintenance Software. This allows our clients Portal access into our Software to review the health of their sites.
These features include the following;
* Routine Maintenance Activities and due dates.
* Site Activity Reports
* Defects currently active on their sites
* Current Quotations and status of quotations.
For further information, please reach out to one of our staff members and we will be happy to provide further information regarding this. | Redeemer Lutheran College | Redeemer Lutheran College | — | 13 Sept 2024 | 13 Oct 2024 | 12 Nov 2024 |
| Actioned | Q-0477** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Cabanda Care | Cabanda Care | — | 13 Sept 2024 | 31 Jan 2025 | 31 Jan 2025 |
| Actioned | Q-0474** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Donaldson Enterprises | Donaldson Nominees | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0476** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Cabanda Care | Cabanda Care | — | 9 Sept 2024 | 30 Nov 2025 | 30 Nov 2025 |
| Actioned | Q-0475** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Cabanda Care | Cabanda Care | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0473** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Marlborough CTS 12012 | Marlborough CTS 12012 | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0472** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Marlborough CTS 12012 | Marlborough CTS 12012 | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0470** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Marlborough CTS 12012 | Marlborough CTS 12012 | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0469** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Marlborough CTS 12012 | Marlborough CTS 12012 | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0468** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Redeemer Lutheran College | Redeemer Lutheran College | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0467** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Redeemer Lutheran College | Redeemer Lutheran College | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0466** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Redeemer Lutheran College | Redeemer Lutheran College | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0465** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brisbane Christian College | Brisbane Christian College Ltd | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0464** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brisbane Christian College | Brisbane Christian College Ltd | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0463** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brisbane Christian College | Brisbane Christian College Ltd | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0462** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Brisbane Christian College | Brisbane Christian College Ltd | — | 9 Sept 2024 | 9 Oct 2024 | 8 Nov 2024 |
| Actioned | Q-0455** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
**As previously reported, the VESDA Aspirator Pipework for both V.E.S.D.A. units in X-8 Building are indicating low flow faults due to contamination and therefore may potentially be unable to detect smoke contamination when required. Our quotation is for the cleaning of this pipework and restoring the flow rates on these respective units back to an operational state.**
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Southern Queensland Correctional Centre | Southern Queensland Correctional Centre | — | 5 Sept 2024 | 30 Apr 2025 | 30 Apr 2025 |
| Actioned | Q-0450** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | Southern Queensland Steel | Southern Queensland Steel Pty Ltd | — | 4 Sept 2024 | 4 Oct 2024 | 3 Nov 2024 |
| Actioned | Q-0445** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | National Archives Australia | National Archives Australia | — | 2 Sept 2024 | 2 Oct 2024 | 1 Nov 2024 |
| Actioned | Q-0437** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | National Archives Australia | National Archives Australia | — | 29 Aug 2024 | 28 Sept 2024 | 28 Sept 2024 |
| Actioned | Q-0440** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. **
Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply:
INCLUSIONS:
• Labour during Leading Fire Services normal working hours (7.00am to 4.00pm Mon to Fri, excluding Public Holidays).
EXCLUSIONS:
• We have not allowed to modify or supply as-installed drawings.
• Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like.
• Work outside of Leading Fire Services normal working hours (as nominated above).
• Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step.
• Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames.
• Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered.
• Access to Energex locked rooms.
• If water isolation for repairs is not successful, costs will apply for pipe freeze.
NOTES & CONDITIONS:
• The Fire and Rescue Service Act 1990 (FRSA), section 104D states that "The occupier of a building must maintain at all times every prescribed fire safety installation to a standard of safety and reliability in the event of fire”.
• Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing.
• Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote.
• Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates.
• This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required.
• The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client.
• Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs.
• In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test.
We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us. | National Archives Australia | National Archives Australia | — | 29 Aug 2024 | 28 Sept 2024 | 28 Sept 2024 |