Defect Quotes

1,192 quotes

StatusRefPropertyClientSeverityRaisedDueExpires
VoidedQ-1032**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**11 Motorway Cct, OrmeauCrew Commercial—17 Mar 202617 Apr 202616 May 2026
VoidedQ-1031**Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment by FCF.** **Reference Documentation Service Report 369287 Service Report 369438** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.11 Motorway Cct, OrmeauCrew Commercial—17 Mar 202617 Apr 202616 May 2026
VoidedQ-1029** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.22 Duke St, Slacks CreekAmplus 1 Pty Ltd ATF Amplus 1 Trust—16 Mar 202616 Apr 202615 May 2026
VoidedQ-1030**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams as outlined below.** **Clarifications and Inclusions. 1. We have allowed for a single site visit for marking up of equipment locations. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**22 Duke St, Slacks CreekAmplus 1 Pty Ltd ATF Amplus 1 Trust—16 Mar 202616 Apr 202615 May 2026
ActionedQ-1027** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Waves On CurrumbinWaves On Currumbin CTS 27983—3 Mar 20263 Apr 20262 May 2026
ActionedQ-1028** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Waves On CurrumbinWaves On Currumbin CTS 27983—3 Mar 20263 Apr 20262 May 2026
ActionedQ-1024** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—2 Mar 20262 Apr 20261 May 2026
ActionedQ-1025** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Waves On CurrumbinWaves On Currumbin CTS 27983—2 Mar 20262 Apr 20261 May 2026
ActionedQ-1023** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—2 Mar 20262 Apr 20261 May 2026
ActionedQ-1022** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Cabanda CareCabanda Care—2 Mar 20262 Apr 20261 May 2026
ActionedQ-1026** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Waves On CurrumbinWaves On Currumbin CTS 27983—2 Mar 20262 Apr 20261 May 2026
ActionedQ-1020** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PURE EnvironmentalPure Environmental Qld Metro Pty Ltd—24 Feb 202624 Mar 202625 Apr 2026
ActionedQ-1018** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PURE EnvironmentalPure Environmental Qld Metro Pty Ltd—24 Feb 202624 Mar 202625 Apr 2026
ActionedQ-1019** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.PURE EnvironmentalPure Environmental Qld Metro Pty Ltd—24 Feb 202624 Mar 202625 Apr 2026
ActionedQ-1017** Leading Fire Services are pleased to submit for your consideration our proposal for repairs identified during the recent inspection of the fire protection equipment. ** **The Building Fire Safety Regulation 2008, Part 5 Prescribed fire safety installations, Division 3 Obligations of occupiers, 54 Maintenance of prescribed fire safety installations Part 4 states that:** **(4) The occupier of the building must ensure the repair is carried out or the corrective action is taken no later than 1 month after the maintenance of the installation was carried out, unless the occupier has a reasonable excuse.** ***Examples of a reasonable excuse— • No appropriately qualified person was available to attend the occupier’s premises to carry out the repair or take the corrective action because of the remoteness of the building’s location. • The repair or corrective action was not able to be finished because of the complexity of the work involved or delay in obtaining parts required for the repair or corrective action.*** Unless specifically noted above, or stated/included within our Scope of Works, the following inclusions, Exclusions, Notes and Conditions will apply: INCLUSIONS: • Labour during Leading Fire Services normal working hours (7.00am to 3.00pm Mon to Fri, excluding Public Holidays). EXCLUSIONS: • Any additional materials or parts not listed in this quote including diesel, batteries, tubes and the like. • Work outside of Leading Fire Services normal working hours (as nominated above). • Scaffolding, Elevated Work Platforms or any High Access Equipment over and above standard 1.8m Step. • Patching, Painting, Core Holes, Fire Penetrations, Fire Sealing, Chasing, Rendering or Cleaning – touch up painting of any doors or frames. • Any re-keying to match original pre-existing key setup of locksets that have been replaced or altered. • Access to Energex locked rooms. • If water isolation for repairs is not successful or we are asked to re-instate the water for any reason, additional costs will apply for a revisit. NOTES & CONDITIONS: • Leading Fire Services standard trading terms apply. A copy of our trading terms can be provided on request. • Leading Fire Services reserve the right to vary our pricing where additional WH&S measures are implemented, not limited to but including: new or modified induction processes, additional police or security checks and assistance with third party auditing. • Where recommendations are made we have allowed to rectify, this price is only valid if accepted with the rest of the quote. • Uninterrupted and continuous site access is required. Delays will incur additional costs at our standard hourly rates. • This quote is valid for a period of 30 days from date of quotation, after which time price adjustments may be required. • The customer is fully responsible to provide access, security clearances and keys on site at time of all routine inspections, call outs in normal working hours and call outs outside working hours and quoted works. All inductions that are beyond thirty minutes duration, will be charged at our normal hourly rate. Parking facilities will be provided and if not, all costs associated will be on charged to the client. • Our pricing has been calculated on the proviso that the full scope of works will be approved and carried out at the same time. Multiple site visits (other than those already expected and allowed for) or variations to our original scope of works, may attract further costs. • In accordance with AS 1851 – 2012 during a hydrostatic test the hydrant system pipe work is pressurized to 1.5 times the systems working pressure or the required design standards. If any unknown system defects are present, a failure of the hydrant system pipe work may occur resulting in damage to building, plant, equipment, facility, or part thereof. Leading Fire Services Pty Ltd, will be held harmless and accept no responsibility for any damage to building, plant, equipment, facility, or part thereof, as a result of any failure of the fitted Fire Hydrant System during any authorized pre-arranged Hydrostatic Test and Hydrant Flow test. We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.Womens Space - 57 Billington St, LabradorThe Benevolent Society—23 Feb 202623 Mar 202624 Apr 2026
VoidedQ-0989**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for IT Services as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0991**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for JF Toilet as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0992**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Junior resource as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0993**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Junior Admin as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0994**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Kleinschmidt Centre as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0995**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for MM Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0996**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Demountable as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0987**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Home Economics as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0998**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the Pool and Toilets as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0999**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for SA Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1000**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Science MB as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1002**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Senior Resource as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1003**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for SH Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0986**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the Graphics as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1004**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for SK Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1005**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for SM Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1006**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Staff Room SC Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1007**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for MG Block Toilet as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1008**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Tuckshop SI Block as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1009**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Junior Undercover Area as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1001**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Science SB as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1010**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Prep and Year 1 as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0984(v2)**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the Admin College as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1011**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Year 3 JG as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0997**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Maintenance Shed as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1012**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Year 4 MH1 as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1013**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Year 5 JG as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1014**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Year 6 MI as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1015**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Year 7 and 8 SD as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-1016**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Year 6 Classrooms as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0988**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for Hospitality as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0985**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the Drama as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0990**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for JB & MPC Lower and Upper as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0984**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the Admin College as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026
VoidedQ-0983**Leading Fire Services are pleased to submit for your consideration our proposal for the supply and installation of the evacuation diagrams for the Chapel as outlined below.** **Clarifications and Inclusions.** **1. We have allowed for a single site visit for marking up of equipment locations per building. 2. Our pricing includes 1 x free client amendment to the evacuation diagrams. Each amendment thereafter will attract an additional fee. 3. We have taken our quantities from the information provided. 4. A PDF version of the diagrams will be provided on completion. If installation is required, additional costs will apply. 5. We have allowed to use the existing frames.** **We would like to thank you for considering Leading Fire Services proposal, and we look forward to working with you should our quote be accepted. If you have any queries or require further information, please do not hesitate in contacting us.**Redeemer Lutheran CollegeRedeemer Lutheran College—16 Feb 202616 Mar 202617 Apr 2026

151–200 of 1,192

PreviousPage 4 of 24Next